 |
Bridge
Design Type 2
Through Deck
In order to reduce the depth between the top of the deck and the underside
of the beam, the deck can be located a third of the way down the depth.
This means having a step within the bridge but reduces the amount the
approach parts have to be built up to meet the deck height. |